Follow these step-by-step directions when using E6000:
1. Please read all directions and test small area before use.
2. Surface should be clean, dry, and free from dirt.
3. Screw precision tip into top of tube cap. Replace with fresh tip as needed.
4. Apply directly to surfaces to be bonded or repaired. Allow 24 hours for curing—Maximum bond strength may not be reached for up to 72 hours.
5. For future easy cap removal, apply a thin coat of petroleum jelly to the threads of the tube before replacing the cap. Clean uncured adhesive with acetone or citrus-based solvents.
NOTE:
Please visit the manufactures website for full health hazard description
Keep out of reach of children
E6000 Industrial Strength Glue
£8,99Prijs
incl.BTW |
Stock expected soon